Huadian Technology ›› 2010, Vol. 32 ›› Issue (9): 1-4.
• 专题综述 • Next Articles
LI Jun
Received:
Revised:
Published:
Abstract: The blockage of GGH by deposited dust of thermal power plant FGD system formed in long term operation seriously influence on the normal operation of the system and is harmful for energysaving and consumption reducing. In addition, serious blockage could damage the boost fan and cause the system accident tripping. The reasons of blockage of GGH by deposited dust in FGD system were analyzed, and some concrete measures for slowing the blockage of GGH by deposited dust were put forward.
Key words: desulphurization system, gas-gas heater (GGH), blockage by deposited dust, reason, measure
LI Jun. Measures for slowing the blockage of GGH by deposited dust in thermal power plant[J]. Huadian Technology, 2010, 32(9): 1-4.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.hdpower.net/EN/
https://www.hdpower.net/EN/Y2010/V32/I9/1
Research on gas turbine combustion pressure fluctuation and the key technologies for its measurement
Experimental study of dissolved oxygen’s effect on dissolved hydrogen analyzer of the main steam
Reasons analysis for tube blasting and preventive measures for superheater of 1000MW supercritical boiler
Research on automatic and seamless switching technology for virtual backup measurement and control units in smart substations