Huadian Technology ›› 2011, Vol. 33 ›› Issue (10): 66-68.
• 技术交流 • Previous Articles Next Articles
CHEN Shuqin, ZHANG Xianhui, LIU Hong, LI Xingzhao
Received:
Revised:
Published:
Abstract: Aiming at the suggestion of the dispatch department, in which the reverse power transmission test of the main transformer was not recommended, a new fast switching over system debugging method was designed. By using this method, the dynamic switching over of auxiliary power before the unit starting can be realized; and the correctness of the dynamic switching of the fast switching over system after the unit was put into operation had been increased.
Key words: main transformer, fast switching over system, dynamic switching, dynamic debugging, new method
CHEN Shuqin;ZHANG Xianhui;LIU Hong;LI Xingzhao. New method of dynamic debuggiong of fast switching over system before reverse power transmission of main transformer[J]. Huadian Technology, 2011, 33(10): 66-68.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.hdpower.net/EN/
https://www.hdpower.net/EN/Y2011/V33/I10/66