Loading...
RSS
Toggle navigation
Home
About Journal
Editorial Board
Editorial Board
Publication Ethics
Journal Online
Just Accepted
Current Issue
Archive
Most Read Articles
Most Downloaded Articles
Most Cited Articles
Subscription
Advertisement
Contact Us
中文
Table of Content
25 October 2011, Volume 33 Issue 10
Previous Issue
Next Issue
专题综述
研究与开发
技术交流
节能与环保
新能源
专题综述
Analysis on technologies of onsite assembly welding and sliding installation for large steel track girder
YANG Kaiping;LIANG Guanghui
2011, 33(10): 1-4.
Asbtract
(
1175
)
Related Articles
|
Metrics
Taking the installation of steel track girder of 3000kN vertical ship lift for Danjiangkou dam heightening project as example, the problems existing in lifting, sliding installation and onsite assembly welding of large steel track girder were introduced. The concrete construction technical measures were put forward, which can be used as reference for installation of similar large steel track girder.
Design of radial working gate of sand sluicing gate in Caojie navigation and hydropower junction project
LIU Yongsheng;HE Mengyun;JIA Shikai
2011, 33(10): 5-9.
Asbtract
(
1094
)
Related Articles
|
Metrics
The working gate of sand sluicing gate of Caojie Navigation and Hydropower Junction Project is extra large type exterior radial gate. The operation condition of the gate is complex. When the water level is the check flood level and the discharge gate is opened fully, the gate bottom edge is in 14.18m below the water surface. The general structure, the design form, the selection of the hoist type and other technical problems of the radial gate were introduced. The experimental research on the flow induced vibration model of the gate structure was carried out, which proved the rationality of the design.
Design of monitoring system for flow of hydraulic turbine
DENG Yaokun
2011, 33(10): 10-12.
Asbtract
(
1235
)
Related Articles
|
Metrics
In Hunan Province Nanjindu Hydropower Station, the monitoring system of the bulb tubular hydraulic generator set was replaced by the PLC monitoring system. After this, based on original differtential pressure flow measurement method, various hydraulic parameters were readjusted and recalibrated; a complementary measure for flow calculation was added; the effective flow calculation formulas were established; in the design of programs for analog data collecting, calculating and monitoring, the local PLC control penel and the touch screen of monitor and control general system (MCGS) of the unit were used sufficiently. Finally, the realtime monitoring of flow of the hydraulic turbine was realized.
Engineering practice of manufacturing special shape bifurcated pipe for hydropower station with ultra high water head by using of 15MnNbR vessel steel
YU Jianhua;ZHANG Jinbin;JIANG Jianguo;YUAN Jianhua
2011, 33(10): 13-15.
Asbtract
(
1130
)
Related Articles
|
Metrics
The shape features of the steel bifurcated pipe and the weldability of 15MnNbR vessel steel were introduced. The manufacturing process of special shape steel bifurcated pipe suitable to ultra high water head and its quality control strategy were analyzed. The technical difficult points and control countermeasures of manufacturing of steel bifurcated pipe in Duodihe Hydropower Station by using 15MnNbR vessel steel were expounded.
Analysis on reasons of abnormal tripping of 220kV high voltage switch in Changzhou Hydropower Station
YE Ning
2011, 33(10): 16-18.
Asbtract
(
1208
)
Related Articles
|
Metrics
The related situations of two times abnormal tripping incidents of 220kV high voltage switch in Changzhou Hydropower Station were introduced. The reasons of abnormal tripping were analyzed. The technical measures and management measures for effectively preventing the abnormal tripping of 220kV high voltage switch were put forward, which ensures that the high voltage switch operates safely and reliably after it was put into operation.
研究与开发
Research on platform of relay protection setting calculation and management for power plant
ZHENG Shouwen;ZHOU Lai
2011, 33(10): 19-21.
Asbtract
(
1183
)
Related Articles
|
Metrics
A design scheme of a general platform of relay protection setting calculation and software management for power plant was put forward. In this scheme, the setting calculation will be done facing concrete relay protection devices directly; and the protection devices will be stored in device information database according to their catagories. In setting calculation process, the selfdefined protection setting mode was provided, and the work load of operators can be decreased, which is more in line with the requirement of the practical production. Combing with Power Plant C, the design was analyzed and tested; and it was proved that the design scheme not only has good commonality, but also has fast calculation speed, high accuracy and strong applicability.
Realization of monitoring platform integration for thermal power plant by DCS
PENG Xiaoyan;ZHAO Zhigang
2011, 33(10): 22-24.
Asbtract
(
1214
)
Related Articles
|
Metrics
The monitoring platform integration for thermal power plant realized by DCS can lessen the interfaces between the control systems and increase control reliability, and can simplify the management of spare parts and reduce the work load of training and maintenance. The application of DCS in thermal power unit control and auxiliary workshop control was expounded; and the problems in the application were analyzed.
Optimization of lubricating oil system of gear reducer in coal mill
HOU Dongwei;ZHU Yaoxian
2011, 33(10): 25-26.
Asbtract
(
998
)
Related Articles
|
Metrics
The lubricating oil system, which includes the selflubrication oil pump and the lubrication oil cooler, is configured for the gear reducer of the coal mill of 200MW unit in a thermal power plant in Zhengzhou. Due to the operation of the selflubrication oil system of the gear reducer was not stable, the gear reducer was damaged frequently. The gear reducer lubrication oil systems of four coal mills of unit No.2 was optimized and reformed; the lubrication oil stations for mill main bear set were used for providing lubrication and cooling for the gear reducers. The operation reliability of gear reducers of the coal mills in unit No.2 was increased greatly. The optimization scheme can be used as reference for the power plant using similar gear reducer of coal mill.
Design of hook pulley specially used for 220kV two bundled lines
WEI Shutian;;YU Yang
2011, 33(10): 27-28.
Asbtract
(
1124
)
Related Articles
|
Metrics
According to the analysis on overhaul process of 220kV two bendled conductors output line, the technical difficult points existed in current overhaul work were found. A hook pulley, which is specially suitable for overhaul of 220kV two bendled conductors transmission line, was designed; and the problem in overhaul can be better solved by using the pulley.
Comparison of calculation of boiler pressure cylinder strength according to ASME codes with that according to domestic standard
CHEN Zhigang;ZHANG Xu;MAO Fujie;WANG Fang
2011, 33(10): 29-31.
Asbtract
(
1222
)
Related Articles
|
Metrics
The strength calculation is important component of steam boikler design. The similarities and differences of the ASME codes volume I and the domestic boiler strength calculation standard, GB/T 9222—2008 “Strength calculation of pressure parts for watertube boiler”, on strength calculation of boiler body were compared and analyzed, which can be used as reference for engineers and technicians.
Frequency domain analysis of rectifier current distribution
XU Lijuan;WANG Zezhong
2011, 33(10): 32-34.
Asbtract
(
1080
)
Related Articles
|
Metrics
By onloading voltage in the ANSYS model, the uneven distribution of each harmonic current between different phases and between different branches of the same phase was analyzed. A method to analyze the uneven distribution of the current by calculation in frequency domain was put forward, which provides more simple and effective way to research the current sharing.
Procurement management for EPC lumpsum contract project of domestic electric power design institutes
LI Liang
2011, 33(10): 35-36.
Asbtract
(
1192
)
Related Articles
|
Metrics
In order to adapt to changes in the economy, the domestic electric power design institutes develop the EPC contracting business, which provides the experiences and lays foundation for their transformation into engineering company. The procurement is very important link in the implementation process of an EPC contract project. The problem of improvement of procurement process was discussed, and some suggestions were put forward; it is expected that this paper will be helpful for electric power design institutes in procurement of equipments and materials.
Optimized design of circulating water system for reconstructed 2×350MW unit
ZHAO Baibo;WANG Xin
2011, 33(10): 37-41.
Asbtract
(
1242
)
Related Articles
|
Metrics
In the reconstructed 2×350MW unit project of Huaneng Jining Power Plant, the preexisting cooling equipment for 2×110MW unit was utilized sufficiently. The cold side parameters of the unit were calculated and optimized. Based on the tendency analysis and the sensitivity analysis, a configuration scheme was put forward, and in this scheme, the annual total operation cost of the unit is most economical. Then the optimization of the unit cold side configuration and the maximizing of operation benefit were realized.
Freeze protection and optimization for indirect air cooling system of 600MW unit
LIU Haijun
2011, 33(10): 42-44.
Asbtract
(
1125
)
Related Articles
|
Metrics
In the indirect air cooling unit, the freeze injury of the radiator can cause the equipment damage and shutdown accident, which may lead serious economic loss for power generation enterprise. Starting from three aspects, the freeze protection of the indirect air cooling system was researched and optimized. The corrective measures of operation mode were put forward; some automatic adjustment and control measures were added, which can ensure the safety of radiator of air cooling unit.
技术交流
Analysis on abnormal chromatograph of insulation oil of main transformer and fault treatment
WANG Baojian;YANG Yongshang
2011, 33(10): 45-47.
Asbtract
(
1252
)
Related Articles
|
Metrics
In Huadian Inner Mongolia Energy Corporation Limited, Baotou Power Generation Branch Company, after the B phase main transformer of unit No.2 was put into operation, during the periodical chromatographic analysis of the gas dissolved in the oil, it was found that the volume fraction of the total hydrocarbon was increasing continuously, and the absolute gas generation rate exceeded the warning value. It was judged that there is over temperature fault inside the transformer. The transformer was overhauled many times and had been transported to the manufacturing factory to repair, and the fault was found and eliminated finally; then the safe and stable operation of the transformer was ensured.
Analysis on reason of a power outage accident in 10kV bus
ZHOU Xuan
2011, 33(10): 48-50.
Asbtract
(
1145
)
Related Articles
|
Metrics
A power outage accident in a 10kV bus was occurred in a company, and it caused a shutdown accident of the production system of the company. The phenomenon of the accident and the action of the protection devices were introduced. The reason of the accident was analyzed. The characteristics of the power system, the neutral point of which is grounded through a resistor, were expounded. The development tendency of the neutral point grounding mode was pointed out.
Comparison and calibration of two kinds of transformer differential protection
GE Xiaojun
2011, 33(10): 51-53.
Asbtract
(
1228
)
Related Articles
|
Metrics
The transformer microcomputer differential protection is very different from the conventional differential protection in their principle and the device structure. And the microcomputer differential protection devices, which are manufactured by different companies, are different from each other; so they must be treated earnestly and respectively in field calibration. The difference of protective principle between the two devices, which are the RCS978, manufactured by Nanjing Nanrui Relay Protection Company Limited, and the CSC326, the product of Beijing Sifang Relay Protection and Automation Company Limited, was compared. Based on this, taking the Y0/Y0/D11 threewinding transformer as example, the calibration step and calibration method of differential protection were introduced.
Optimized reformation of multiring coal feeder
XIE Wujie
2011, 33(10): 54-55.
Asbtract
(
1210
)
Related Articles
|
Metrics
Some problems of multiring coal feeder of coal handling system, such as the insufficient output of the coal feeder, the coal leakage and serious wear of travelling wheel and coal bearing platform, were analyzed. Several optimal reformation schemes were put forward. The coal feeder had been reformed, and satisfactory effect was obtained.
Calculation and analysis of auxiliary power consumption rate of thermal power plant
YANG Yiwei
2011, 33(10): 56-57.
Asbtract
(
4581
)
Related Articles
|
Metrics
The calculation method of auxiliary power consumption rate of thermal power plant was introduced. The main factors influencing on the auxiliary power consumption rate were analyzed. Some measures for decreasing the auxiliary power consumption rate were put forward, which can be used as reference for thermal power plants to decrease own auxiliary power consumption rate.
Analysis on vacuum problem of condenser of 300MW turboset
PENG Quanyuan;YAN Xianghong
2011, 33(10): 58-59.
Asbtract
(
1153
)
Related Articles
|
Metrics
The factors influencing on the vacuum of 300MW turboset were analyzed. Combining with the actual situation of the power plant, the vacuum problem occurred in condensing turbine unit was expounded. The method to enhance the condenser vacuum was found out, providing reference for the persons of the same profesional to handling similar problems.
Optimized reformation of thermal system of 600MW unit for preventing unplanned outage
HE Yang
2011, 33(10): 60-63.
Asbtract
(
1107
)
Related Articles
|
Metrics
The hidden dangers existed in each link of thermal system of Jiangsu Guoxin Yangzhou Power Generation Company Limited were investigated. The related control systems, logic and site components were rectified and optimized. The thermal system was perfected. Thus, the possibility of the unplanned outage was decreased; and the safe and stable operation of the unit was ensured.
Analysis on reasons of two times leakage incidents of hydraulic oil system in PG9171E gas turbine
YU Lifan
2011, 33(10): 64-65.
Asbtract
(
1051
)
Related Articles
|
Metrics
In Xinjiang Kashgar Emergency Power Station, during debugging and operation of the PG9171E gas turbine, two times leakage incidents were occurred in hydraulic oil system of PG9171E gas turbine. The finding process and treating process of the two leakage incidents were introduced. A conclusion was summarized, which is that when the leakage of the hydraulic oil system was occurred, the auxiliary hydraulic oil pump will start automatically; if the outlet pressure of the hydraulic oil system is lower, then the motor current of auxiliary hydraulic oil pump is smaller and the leakage point is closer to the oil pump outlet. The experience can be used as reference for technicians to treat similar problems.
New method of dynamic debuggiong of fast switching over system before reverse power transmission of main transformer
CHEN Shuqin;ZHANG Xianhui;LIU Hong;LI Xingzhao
2011, 33(10): 66-68.
Asbtract
(
1202
)
Related Articles
|
Metrics
Aiming at the suggestion of the dispatch department, in which the reverse power transmission test of the main transformer was not recommended, a new fast switching over system debugging method was designed. By using this method, the dynamic switching over of auxiliary power before the unit starting can be realized; and the correctness of the dynamic switching of the fast switching over system after the unit was put into operation had been increased.
节能与环保
An energysaving measure for 300MW unit by turning off its boost fan under low load condition
YAO Zhongdong;CAO Yongqi;GUO Xusheng
2011, 33(10): 69-71.
Asbtract
(
959
)
Related Articles
|
Metrics
The technical parameters and performances of the induced draft fan and the boost fan were introduced. The feasibility of turning off the boost fan under operation condition was analyzed. As an energysaving measure, the boost fan was turned off, and the desulphurization system was driven by induced draft fan in series mode, and favourable economic benefit was obtained.
Optimized reformation of electrostatic precipitator of 200MW unit
BAI Guogang
2011, 33(10): 72-76.
Asbtract
(
1067
)
Related Articles
|
Metrics
The electrostatic precipitator of a 200MW unit was reformed into electrostaticfabric filter. The reason of the reformation was introduced. The comparison and analysis of the device type selection were discussed. The main implementation scheme was described. The working principle and the performance characteristics of the electrostaticfabric filter was analyzed. The operation regulating measures were put forward. The concentration of the dust emission of the unit was decreased, and the economic benefit and the social effect were improved.
新能源
Treatment measures of molten core of nuclear reactor
RAN Ke;ZHOU Tao;LI Jingjing
2011, 33(10): 77-81.
Asbtract
(
1122
)
Related Articles
|
Metrics
Based on the analysis of the structure features, the heat transfering characteristics of the nuclear reactor molten core and the cooling treatment strategy for the molten core, according to the analysis and comparison of the treanment measures for the molten cores of four type nuclear power plants, which are AP1000, EPR, VVER1000 and the boilingwater reactor in Fukushima, Japan, it was confirmed that to cool and to contain the molten core in a pressure vessel have very important function for mitigating serious accidents. The difference in treatment mode of molten core influences the range of application of reactor unit power in a certain degree. The treatment mode of molten core of new reactor pattern is improved obviously comparing with the previous one. The difference in measures of different reactors for treatment serious accident reflect the difference in design concept of different reactor patterns. The remedial measures of molten core for various reactor patterns were researched in depth, which has important value for ensuring the safety of nuclear power plants.
Author Center
Online Submission
Citation Format
Copyright Agreement
Template
Author Guidelines
Review Center
Peer Review
Editor Work
Editor-in-Chief
Office Work
Journal Online
Just Accepted
Current Issue
Archive
Most Read Articles
Most Downloaded Articles
Most Cited Articles