Abstract: Taking the installation of steel track girder of 3000kN vertical ship lift for Danjiangkou dam heightening project as example, the problems existing in lifting, sliding installation and onsite assembly welding of large steel track girder were introduced. The concrete construction technical measures were put forward, which can be used as reference for installation of similar large steel track girder.
Key words: steel track girder, on-site assembly welding, sliding installation, construction technology, application
YANG Kaiping;LIANG Guanghui. Analysis on technologies of onsite assembly welding and sliding installation for large steel track girder[J]. Huadian Technology, 2011, 33(10): 1-4.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.hdpower.net/EN/
https://www.hdpower.net/EN/Y2011/V33/I10/1
Technical schemes for waste heat deep utilization in gas distributed energy stations