Huadian Technology ›› 2011, Vol. 33 ›› Issue (10): 60-63.

• 技术交流 • Previous Articles     Next Articles

Optimized reformation of thermal system of 600MW unit for preventing unplanned outage

HE Yang   

  1. Jiangsu Guoxin Yangzhou Power Generation Company Limited, Yangzhou 225131, China
  • Received:1900-01-01 Revised:1900-01-01 Published:2011-10-25

Abstract: The hidden dangers existed in each link of thermal system of Jiangsu Guoxin Yangzhou Power Generation Company Limited were investigated. The related control systems, logic and site components were rectified and optimized. The thermal system was perfected. Thus, the possibility of the unplanned outage was decreased; and the safe and stable operation of the unit was ensured.

Key words: unplanned outage, thermal system, hidden danger, control, optimization, rectification