Abstract: In Huadian Inner Mongolia Energy Corporation Limited, Baotou Power Generation Branch Company, after the B phase main transformer of unit No.2 was put into operation, during the periodical chromatographic analysis of the gas dissolved in the oil, it was found that the volume fraction of the total hydrocarbon was increasing continuously, and the absolute gas generation rate exceeded the warning value. It was judged that there is over temperature fault inside the transformer. The transformer was overhauled many times and had been transported to the manufacturing factory to repair, and the fault was found and eliminated finally; then the safe and stable operation of the transformer was ensured.
Key words: transformer, chromatographic analysis, total hydrocarbon, fault diagnosis
WANG Baojian;YANG Yongshang. Analysis on abnormal chromatograph of insulation oil of main transformer and fault treatment[J]. Huadian Technology, 2011, 33(10): 45-47.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.hdpower.net/EN/
https://www.hdpower.net/EN/Y2011/V33/I10/45
一起电子互感器异常引发的复杂发展性故障分析及改进
Predictive maintenance of power plant equipment driven by “cloud+client” big data
Analysis of a power supply scheme for SRS in a thermal power plant