Huadian Technology ›› 2011, Vol. 33 ›› Issue (12): 12-14.

• 专题综述 • Previous Articles     Next Articles

Analysis on layout scheme of turbine building for 600MW grade thermal power unit

GAO Zhenbao, YANG Junbo, ZHANG Lechuan, HU Xundong, LI Lin   

  1. Shandong Electric Power Engineering Consulting Institute Corporation Limited, Jinan 250013, China
  • Received:1900-01-01 Revised:1900-01-01 Online:2011-12-25 Published:2011-12-25

Abstract: The optimization of the turbine building layout in thermal power plant is mainly developed centering on arrangement of the deaerator. Taking domestic 600MW grade thermal power unit as example, the technical characteristics, the economical efficiency and the applicability of several layout schemes of turbine building (deaerator room) with advanced indexes were analyzed; and some matters needing attention in design were put forward, which can be used as reference for engineering design and selection for investors.

Key words: 600MW grade thermal power unit, turbine building, optimal layout, economical efficiency, practicability