Abstract: The attemperating water system is not designed in the inlet of the separated platen superheater of the 600MW supercritical boiler manufactured in Shanghai Boiler Works Corporation Limited. At the initial startup stage of the boiler, due to the plasma ignition and the larger heat loss of the boiler in wetstate operation stage, the steam temperature in outlet of the separated platen superheater is easily exceeded the limit. Aiming at this problem, based on analysis and site practice, the effective method to control the outlet steam temperature was found.
Key words: supercritical boiler, overtemperature of separated platen, reason, measure
XIAO Lizheng;LIU Xiaojun. Analysis and control of steam overtemperature in separated platen superheater outlet of 600MW supercritical boiler at initial startup stage[J]. Huadian Technology, 2011, 33(12): 15-17.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.hdpower.net/EN/
https://www.hdpower.net/EN/Y2011/V33/I12/15
Research on gas turbine combustion pressure fluctuation and the key technologies for its measurement
Experimental study of dissolved oxygen’s effect on dissolved hydrogen analyzer of the main steam
Reasons analysis for tube blasting and preventive measures for superheater of 1000MW supercritical boiler