Optimized design and reformation for coal handling system of 2×300MW unit

GUAN Shaojiang1,WANG Wei2,DAI Shuxiang3   

  1. 1.Heilongjiang Huadian Fulaerji Power Generation Corporation Limited, Qiqihar 161041, China; 2.Heilongjiang Huadian Qiqihar Thermal Power Corporation Limited, Qiqihar 161001, China; 3.Electric Power Engineering Corporation Limited of Heilongjiang Huadian Fulaerji Power Generation Corporation Limited, Qiqihar 161041, China
  • Received:1900-01-01 Revised:1900-01-01 Published:2011-06-25

Abstract: The design of the coal handling system of a newlybuilt power plant is not rational, many problems occurred in some equipments operation, and there are potential safety hazards to the system. The problems were analyzed and discussed. Combining with site practical situations, the treatment methods were put forward to ensure the safe operation of the system. 

Key words: coal handling system, optimized design, safe operation, environmental protection