Abstract: The vibration measurement experiment under synchronization condition with power changing of Asahan First Stage Hydropower Station was studied. Starting from the aspects of the +x/+y swing amplitudes of upper guide bearings and others, the measuring steps of the vibration measurement experiment under synchronization condition with power changing were expounded; and the relationship between the vibration zone and the operation stability of related unit was analyzed emphatically, which can provide some references for other oversea projects.
Key words: hydropower station, vibration measurement with power changing, vibration zone, swing amplitude
CHEN Wei;WANG Zhihao;ZHOU Qingke. Analysis on vibration measurement experiment under synchronization condition with power changing of Asahan First Stage Hydropower Station[J]. Huadian Technology, 2011, 33(6): 40-41.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.hdpower.net/EN/
https://www.hdpower.net/EN/Y2011/V33/I6/40
Operation region partition for hydraulic turbine generator units based on stability test data
Stress test and analysis of submerged radial gate structure of hydropower station