Huadian Technology ›› 2011, Vol. 33 ›› Issue (6): 47-49.
• 技术交流 • Previous Articles Next Articles
WEI Xiaobao
Received:
Revised:
Published:
Abstract: Combining with site statistical data, various steps of cement cushion fabrication were introduced. The main reasons of the lower firsttime qualification rate were analyzed. Relevant countermeasures were given, and the firsttime qualification rate of cement cushion fabrication was increased.
Key words: steam turbine, cement cushion, fabrication process, air bubble, first-time qualification rate
WEI Xiaobao. Method for increasing firsttime qualification rate of cement cushion fabrication[J]. Huadian Technology, 2011, 33(6): 47-49.