Huadian Technology ›› 2012, Vol. 34 ›› Issue (10): 55-56.
• 技术交流 • Previous Articles Next Articles
HONG Li
Received:
Revised:
Published:
Abstract:
The problem of the condensate pump output power rapidly dropping repeatedly ocuurred in the debugging process of the 1000MW unit in Huilai Power
Plant was analyzed. The basic reason of above problem was found,and the practical feasible treatment method and preventive measures were put forward.
Key words: condensate pump, dropping of output power, air leakage, cavitation, air bind, countermeasure
HONG Li. Analysis on reason of rapid dropping of condensate pump output power and countermeasures[J]. Huadian Technology, 2012, 34(10): 55-56.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.hdpower.net/EN/
https://www.hdpower.net/EN/Y2012/V34/I10/55
Optimization of air preheater leakage control system in 670MW unit
Optimization of deep frequency conversion transformation for condensate pump in 1000MW secondary reheat unit