Huadian Technology ›› 2013, Vol. 35 ›› Issue (10): 72-73.
Previous Articles Next Articles
Published:
Abstract: Abstract:At November 5, 2012, three of output transmission lines of Togtoh Power Generation Company Limited tripped, and this caused the units No.1, 2, 3 and 5 shut down urgently. The emergency command management, the equipment management, the operation management, the coldproof and antifreeze, the logistical support and others in accident treatment process were analyzed, and the disposal methods were given, which provide reference for similar event treatment.
Key words: Key words:emergency shutdown, emergency command management, equipment management, operation management, coldproof and antifreeze
ZHANG Longgang. Analysis on disposal of emergency shutdown accident of Togtoh Power Generation Company Limited[J]. Huadian Technology, 2013, 35(10): 72-73.