Huadian Technology ›› 2013, Vol. 35 ›› Issue (11): 1-2.
Next Articles
Published:
Abstract: Abstract:The rain and snow weather caused the transmission line tripout accidents of the YuanBa Line I, YuanBa Line II and YuanAn line I of Hunyuan 500kV switch station. The reasons of tripout accidents and the tripping process were analyzed. Effective countermeasures were adopted so as to ensure the generator units of Inner Mongolia Datang International Togtoh Power Generation Company Limited to operate safely as far as possible.
Key words: Key words:“11.5”accident, reason analysis, subsynchronous resonance, blocking filter, torsional vibration stress protection, asynchronous selfexcitation, modal I, modal II
DAI Shuqin. Analysis on reason and action process of 500kV line tripping DAI Shuqin[J]. Huadian Technology, 2013, 35(11): 1-2.