Huadian Technology ›› 2013, Vol. 35 ›› Issue (11): 30-32.

Previous Articles     Next Articles

Control strategy of turbine performance test of thermal power plant

  

  1. (1.Xi’an Thermal Power Research Institute Company Limited, Xi’an 710032, China; 2.College of Energy and Power Engineering, Xi’an Jiaotong University, Xi’an 710049, China; 3.College of Information Engineering, Chang'an University, Xi’an 710064, China)
  • Online:2013-11-25 Published:2013-12-30

Abstract: Abstract:The automatic control system of thermal power unit was introduced. Several conditions of turbine performance test, such as to keep the valve fully opened, to keep valve opening to be constant, to maintain high back pressure, to cut off high pressure heater and so on, were analyzed, and relevant control measures were put forward, which provide guidance for operators and performance testing engineers of power plant in both theory and practice.

Key words: Key words:automatic control system, coordinated control system, boiler follows turbine, steam turbine, high back pressure, high pressure heater