Equipment reformation and operation optimization of desulphurization system after bypass is cancelled in power plant

  

  1. (Inner Mongolia Branch of Datang International Power Generation Company Limited, Hohhot 010206, China)
  • Online:2014-11-25 Published:2014-12-17

Abstract: Abstract:There are some risks in unit operation after the desulphurization bypass of the unit was cancelled. The risks were analyzed. Some measures of the logic optimization, the operation optimization and the equipment reformation were adopted. After the system had been reformed, the operation reliability of the desulphurization system was improved, and the operation period of the desulphurization system is suitable for the repair cycle of the unit.