Huadian Technology ›› 2014, Vol. 36 ›› Issue (12): 26-28.

Previous Articles     Next Articles

Analysis on arrangement of construction machinery for 1000MW unit

  

  1. (Huadian Zhengzhou Mechanical Design Institute Company Limited, Zhengzhou 450015, China)
  • Online:2014-12-25 Published:2015-02-04

Abstract: Abstract:The structure of domestic 1000MW unit boiler and the features of lifting construction of the boiler were introduced. The different arrangement schemes of the main construction cranes were given. Combining with project examples, the arrangement schemes were compared. Based on analysis of development trend of the main lifting equipment, it was proposed that the novel movable arm tower crane is the first choice for construction of various boilers in thermal power plants.

Key words: Keywords:1000MW unit, boiler lifting, movable arm tower crane, horizontal arm tower crane