Huadian Technology ›› 2014, Vol. 36 ›› Issue (12): 52-53.
Previous Articles Next Articles
Published:
Abstract: Abstract:After the newbuilt 2×600MW unit of Luzhou Power Plant was put into operation, some problems always existed in operation of the coal pulverizing system, which include the blockage of the mills and the separators, the abnormal condition of the measurement points in the system, the surge of the primary air fan and others. The reasons of the problems were analyzed. The treatment measures were proposed and adopted, and the problems in the directfired pulverizing system were controlled effectively.
Key words: Keywords:directfired pulverizing system, mill, separator, primary air fan
HUANG Taiming. Analysis on reasons of problems occurred in operation of directfired pulverizing system and treatment[J]. Huadian Technology, 2014, 36(12): 52-53.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.hdpower.net/EN/
https://www.hdpower.net/EN/Y2014/V36/I12/52
Research and application of new flue gas ultralow emission technology