Huadian Technology ›› 2014, Vol. 36 ›› Issue (6): 4-7.

Previous Articles     Next Articles

Schemes analysis of building installation in the natural gas distributed energy station

  

  1. (Huadian Distributed Energy Engineering Technology Corporation Limited, Beijing 100160,China)
  • Online:2014-06-25 Published:2014-08-05

Abstract: Abstract:Give example as distributed energy station in Huadian Industrial Park project, designing ideas of forbuilding distributed energy station installation schemes were analyzed. Pass through calculation, analysis and reasonable allocation of distributed energy station equipment, an optimized scheme was concluded that the energy station can realize highest efficiency and achieve maximum return at minimum investment, as well as meet the requirements of normal operation.

Key words: Keywords:distributed energy station, installation scheme, installed capacity, host, peak shaving