Abstract: Abstract:The original governor of the Suofengying Hydropower Plant of Wujiang Company has various defects in its function and accuracy and can not satisfy the operation requirement. The reasons of the defects were analyzed, and the solutions were proposed. The original hydraulic turbine governor was replaced by a new type one. The governor can operate in power closed-loop mode. The experiences of this paper can be used as reference for other hydropower enterprises to solve similar problems.

Key words: Keywords:hydraulic turbine governor, power closedloop mode, application, performance comparison, economic benefit comparison