Excavation quality control of rockanchored beam of underground powerhouse in Elephant Trunk Hill Hydropower Station

  

  1. (Guizhou Xineng Electric Power Construction Company Limited, Guiyang 550004, China)
  • Online:2015-03-25 Published:2015-05-14

Abstract: Abstract:The general situation of the underground powerhouse project of Elephant Trunk Hill Hydropower Station and the geologic features were introduced. The quality control measures of the rockanchored beam excavation of the underground powerhouse were expounded. The construction scheme of the rockanchored beam excavation was put forward. According to the bursting test result, the rational parameters were determined. The remained halfhole rate, the flatness and the bodily form of the excavation surface meet the specification and design requirement. The conclusion of the united acceptance inspection is“excellent”.

Key words: Keywords:Elephant Trunk Hill Hydropower Station, underground powerhouse, rockanchored beam, excavation quality control