Huadian Technology ›› 2015, Vol. 37 ›› Issue (3): 64-65.
Previous Articles Next Articles
Published:
Abstract: Abstract:The general situation of the underground powerhouse project of Elephant Trunk Hill Hydropower Station and the geologic features were introduced. The quality control measures of the rockanchored beam excavation of the underground powerhouse were expounded. The construction scheme of the rockanchored beam excavation was put forward. According to the bursting test result, the rational parameters were determined. The remained halfhole rate, the flatness and the bodily form of the excavation surface meet the specification and design requirement. The conclusion of the united acceptance inspection is“excellent”.
Key words: Keywords:Elephant Trunk Hill Hydropower Station, underground powerhouse, rockanchored beam, excavation quality control
TANG Xianghua, GONG Rui. Excavation quality control of rockanchored beam of underground powerhouse in Elephant Trunk Hill Hydropower Station[J]. Huadian Technology, 2015, 37(3): 64-65.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.hdpower.net/EN/
https://www.hdpower.net/EN/Y2015/V37/I3/64