Huadian Technology ›› 2015, Vol. 37 ›› Issue (7): 32-34.
Previous Articles Next Articles
Published:
Abstract:
Abstract:There are some problems in electrical design of 300MW and above thermal power units, which include the unreasonable dsign, the high energy consumption and nonconvenience for operation and overhaul. Taking the newbuilt unit of Tianjin Junliangcheng Power Generation Company Limited as example, the problems needing attention in design of the security power, the highvoltage motor, the hydrogencooled generator and the lowvoltage power center were put forward. At the same time, it was pointed out that before construction, the examining of the design drawing must be strengthened, and more attention must be paid to the leavefactory check and acceptance of the equipment for ensuring the unit to operate safely and stably.
Key words: Keywords:newbuilt thermal power unit, electrical design, construction, test run
TAN Pengzhan. Problems needing attention in electrical design of newbuilt thermal power unit[J]. Huadian Technology, 2015, 37(7): 32-34.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.hdpower.net/EN/
https://www.hdpower.net/EN/Y2015/V37/I7/32
Comprehensive upgrading reconstruction and performance analysis of a subcritical boiler
Reflect on intelligent construction of gasfired distributed energy stations