Huadian Technology ›› 2018, Vol. 40 ›› Issue (1): 68-70.

Previous Articles     Next Articles

Study on heating reform of steam turbine unit

  

  1. 1.Xinzhou Guangyu Coal Power Company Limited, Xinzhou 034000,China;2.Huadian Zhengzhou Mechanical Design Institute Company Limited, Zhengzhou 450046,China
  • Online:2018-01-25 Published:2018-02-07

Abstract:

In response to national policies energy conservation and emissions reduction, to meet the demand of civil heating supply modification,2×135MW steam turbine were taken into heatandpower cogeneration transformation. The extraction condensate heating unit was changed into back pressure unit, a new unicom exhaust pipes will consolidate and lead the gas from the 2 upper roads to DN1200mm steam supply line, at the same time extract 5t/h steam ,which after temperature and pressure reduction, will be cooled in the low pressure cylinder. Compared the parameters and main economic indicators before and after modification, the project can save about 9.4kt of standard coal every year, which reduce the consumption of coal and smoke in the region.