Key points to equipment selection for a centralized photovoltaic power station

  

  1. Guodian Nanjing Automation Company Limited,Nanjing 210032,China
  • Online:2020-12-25 Published:2021-01-04

Abstract: Under the current "bidding to grid" policy for photovoltaic(PV) projects, projects must reduce their costs and increase their efficiencies, which makes higher requirements on equipment selection. Considering the design for a photovoltaic power station in Northwest China and emerging technologies in the industry, key points to the type selection of in-situ step-up transformers, inverters, cables and other equipment were discussed, and integration plans with different equipment were proposed. Through technical and economic comparisons, especially considering the project cost, a suitable equipment selection solution for large-scale centralized PV power stations was selected. The reasonable solution is of lower cost and reliable operation. Lower construction cost of PV power stations lead to a cheaper on-grid electricity price, which improves the competitiveness of PV industry of China.

Key words: PV power station, bidding to grid, in-situ step-up transformer, inverter, equipment selection key point, project cost, layout of inverter arrays