Huadian Technology ›› 2013, Vol. 35 ›› Issue (1): 52-53.
• 技术交流 • Previous Articles Next Articles
WANG Qiqin
Received:
Revised:
Online:
Published:
Abstract: The original cause of starting up of level F gas turbine generation unit with frequency conversion was introduced. Taking the S109FA unit as example, the different points between the typical connection of generator PT and the conventional connection were analyzed. The improvement scheme for PT typical connection was put forward, which is helpful for ensuring safe operation of the unit.
Key words: S109FA unit, generator, connection of potential transformer (PT), improved scheme
WANG Qiqin. Improved connection scheme for potential transformer of generator of S109FA unit[J]. Huadian Technology, 2013, 35(1): 52-53.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.hdpower.net/EN/
https://www.hdpower.net/EN/Y2013/V35/I1/52
Operation region partition for hydraulic turbine generator units based on stability test data
Optimization strategy of multiple output cables samephase parallel operation for gas turbine generators
Setting coordination of field loss protection with admittance and excitation device low excitation limit
Field test, analysis and recommendations for injection stator grounding protection
Derating and efficiency optimization operation of wind turbines running above cutout wind speed
Energysaving transformation of vacuum pump in 660MW steam turbine generator set
Discussion on operation and maintenance of hydrogencooling generator adsorption type hydrogen drying device