Huadian Technology ›› 2013, Vol. 35 ›› Issue (1): 52-53.

• 技术交流 • Previous Articles     Next Articles

Improved connection scheme for potential transformer of generator of S109FA unit

WANG Qiqin   

  1. Hangzhou Huadian Banshan Power Generation Company Limited, Hangzhou 310015, China
  • Received:1900-01-01 Revised:1900-01-01 Online:2013-01-25 Published:2013-01-25

Abstract: The original cause of starting up of level F gas turbine generation unit with frequency conversion was introduced. Taking the S109FA unit as example, the different points between the typical connection of generator PT and the conventional connection were analyzed. The improvement scheme for PT typical connection was put forward, which is helpful for ensuring safe operation of the unit.

Key words: S109FA unit, generator, connection of potential transformer (PT), improved scheme