Huadian Technology ›› 2008, Vol. 30 ›› Issue (5): 15-18.
• 专题综述 • Previous Articles Next Articles
ZHANG Xin-chun
Received:
Revised:
Published:
Contact:
Abstract: The features of the 1000MW ultra-supercritical unit of the phase Ⅳ project in Huadian International Zouxian power plant were introduced. The problems appeared during commissioning process and their solutions were discussed. Some matters needed to paying attention during total start-up period of ultra-supercritical turbine were summed up. It is expected that this article will be referable for construction and commission of the same type units by author.
Key words: 1000MW ultra-supercritical unit, trial operation, problem, solution
ZHANG Xin-chun. The Problems Existing in Commissioning of 1000MW Ultra-supercritical Unit and the Solutions [J]. Huadian Technology, 2008, 30(5): 15-18.