    25 April 2015, Volume 37 Issue 4
    Treatment measures of collapse and water gushing of water diversion tunnel of Mupo Hydropower Station
    TANG Xianghua, GONG Rui
    2015, 37(4):  1-3. 
    Asbtract ( 413 )  
    Related Articles | Metrics
    Abstract:In excavation process of the water diversion tennel of Mupo Hydropower station, the collapse and water gushing were occurred. Aiming at this problem, based on analysis of the surrounding rock geology and the underground water features, some countermeasures, such as ahead ductule grouting, ahead anchor bolt support and steel sopport, were adopted. The excavation construction progress was improved effectively, and favorable economic benefit and social effect were obtained.
    Analysis on vibration reasons of speed controller oil pipeline of unit No.3 in Huanglongtan Hydropower Station and treatment
    DENG Chenghong
    2015, 37(4):  4-4. 
    Asbtract ( 368 )  
    Related Articles | Metrics
    Abstract:In Huanglongtan Hydropower Station, in the processes of startup, shutdown and load regulation of the unit No.3, the vibration of the speed controller oil pipeline was too large, which seriously threatened safe and stable operatin of the unit. According to analysis, some measures, such as to reinforce the speed controller oil pipeline and to readjust the route and time of the speed controller in startup and shutdown process, were adopted. The vibration of the oil pipeline was eliminated effectively.
    Type selection and design of sevice gate of ice gate in Xiaoshankou Secondlevel Hydropower Station
    YANG Lijuan1, ZHAO Zhongying2
    2015, 37(4):  5-6. 
    Asbtract ( 297 )  
    Related Articles | Metrics
    Abstract:Normal operation of the ice gate is an important safegard for diversiontype hydropower station located in cold region to operate safely in winter. The design schame of the ice gate of Xiaoshankou Secondlevel Hydropower Station was analyzed. The measures to ensure the ice gate to operate safely were given, which can be used as reference for similar projects.
    Comparison and selection of technical economical schemes of main machine cooling system in a mine mouth power plant
    WANG Shenglong1, WANG Jiangyi2, ZHANG Shufang2, NIU Yufa1, WANG Jun1, CHEN Yuqi3
    2015, 37(4):  7-13. 
    Asbtract ( 346 )  
    Related Articles | Metrics
    Abstract:Using national economic evaluation method, the internal revenue rates under differential investment of two cooling schames of a mine mouth power plant, which are reservoir composited cooling water supply (oncethrough cooling water supply and recirculating water cooling system) and cooling tower secondary circulation method, were compared. The comparison conclusion is that the scheme of reservoir composited cooling water supply is superior to the cooling tower secondary circulation method. The technical advancement and the economy of the scheme are as below. The water temperature of the reservoir, whch is locates in piedmont of high latitude area, is more lower. The back pressure of the steam turbine with final stage long blade is lower. The Rankine cycle efficiency of the unit is higher. The evaporation loss of the water resource is reduced as far as possible, so the water saving effect is excellent. The difficulty of the reservoir to melt ice in winter is solved, and the discharge is meets with the standard of thermal discharge of the reservoir. The scale of the project is larger, and the social effect is favourable. The coal mine, the thermal power generation, the hydropower generation and the reservoir were developed integratedly, which formed great intensive advantages and comprehensive development effects. The generating cost of the plant is lower. The reservoir composited cooling water supply scheme is an innovative application of the oncethrough water supply cooling system in arid region.
    New scheme for improvement of reliability of emergency power supply system of 1000MW unit
    LI Qingchang, WANG Jiazi
    2015, 37(4):  14-15. 
    Asbtract ( 391 )  
    Related Articles | Metrics
    Abstract:To provide power supply for oil pumps of the steam turbine and the feed pump turbine and other important loads under unit fault condition is the key task of the 400V emergency power supply system of power plant. The startup failure of the diesel generator set in the emergency power supply system will caused the 400V emergency power supply system to be not able to supply power under emergency condition, which may lead major accident and massive loss. Based on conventional design of the emergency power supply system for 1000MW unit given by design institute, a new scheme was proposed, which can improve the reliability of the 400V emergency power supply system effctively.
    Optimal design of drainage system of coal yard and ash yard for power plant located in highrainfall port
    JIANG Fangshuai, LI Nan
    2015, 37(4):  16-18. 
    Asbtract ( 477 )  
    Related Articles | Metrics
    Abstract:According to the local raining condition and the port position features of the Cambodia Sihanouk Power Plant, aiming at the problems existed in original drainage system of the coal yard and the ash yard, a new overflowtype drainage scheme was proposed. The analysis shows that the overflowtype drainage scheme can meet the drainage requirement. Meanwhile, the scheme can reduce the cost by about 3.34 million yuan.
    Analysis on fault of loose connection of terminals in secondary circuit of current transformer
    WANG Song1, WU Pengyue2, SUN Ganghu2, WANG Zhigao1, GAN Jianghua3
    2015, 37(4):  19-21. 
    Asbtract ( 522 )  
    Related Articles | Metrics
    Abstract:A false trip accident of generator differential protection, which was caused by poor contact of secondary circuit of current transformer, was described. Using the circuit model of current transformer, the mechanism of overvoltage fault caused by opencircuit of secondary winding of current transformer was analyzed. The opencircuit test of secondary circuit of current transformer was carried out in laboratory. The relationship between the overvoltage and the primary current was verified qualitatively. At last, several methods to check the poor contact of secondary circuit of current transformer were given.
    Realization mechanism of I/O module redundancy of maxDNA distributed control system
    WANG Danlin, WU Shenghua, MA Weidong
    2015, 37(4):  22-24. 
    Asbtract ( 450 )  
    Related Articles | Metrics
    Abstract:The redundant I/O module technology used in maxDNA distributed control system to improe the system reliability was introduced. Aiming at different applications, there are two modes for the I/O module redundant configuration of the maxDNA system, which are the redundant I/O module redundancy and the mixed redundancy. In the mixed redundancy configuration mode, there are two mixed I/O switching over modules YMODULE and IMODULE, which provide different ways to connect nonredundant I/O modules into I/O bus network. In actual application, according to actual needs, it is able to adopt flexible redundancy configuration for the maxDNA system to improve the system reliability.
    GRC composite prefabricated cabin structure of secondary equipment and simulation analysis
    GU Jinshu1, YUAN Difei1,YU Chunlin1,BAO Anqun1, SU Lin2, CHE Yong3, SHAN Qiang3
    2015, 37(4):  25-27. 
    Asbtract ( 291 )  
    Related Articles | Metrics
    Abstract:A novel secondary equipment cabin prefabricated by glassfiber reinforced concrete (GRC) composite material was introduced. The structural style and the features of the cabin were analyzed. Based on simulation analysis, the total calorific value was calculated, and a conclusion was obtained that the equipment cabin is suitable for various regions with extreme weather.
    Analysis on fracture failure of EHV line clamp terminal
    CHEN Jiaquan, LIU Fuying, SU Guangyao, HUANG Haixin, WU Genshen
    2015, 37(4):  28-31. 
    Asbtract ( 258 )  
    Related Articles | Metrics
    Abstract:In a substation, the line clamp terminal of the EHV transformer failed due to fracture. Mechanical property test, microstructure analysis, sample fracture analysis and finite element calculation for the clamp terminal were carried out. It was determined by the analysis results that there were defects in the clamp terminal material, which include the micro-pores, the casting shrinkage hole (or loose) and others. Meanwhile, the bolt pretightening force during the clamp terminal installation was too large. These caused the fracture failure of the clamp terminal. Some targeted improvement suggestions were given.
    Analysis on selfdeveloped Excel data acquisition system used in LED screen
    CHEN Hao, CHENG Liang
    2015, 37(4):  32-35. 
    Asbtract ( 273 )  
    Related Articles | Metrics
    Abstract:The LED synchronous display technology was introduced. A selfdeveloped data acquisitin was introduced, in which the Excel VBA is used to realize realtime communication with NT6000 DCS. The concrete realization process was analyzed. The technology was used in the LED screen of center centralized control room of the power plant. The diversified display was realized, and the system operates stably and reliably.
    Causes analysis of large terminal temperature difference of 600MW subcritical generator 
    HUANG Taiming
    2015, 37(4):  36-38. 
    Asbtract ( 400 )  
    Related Articles | Metrics
    Abstract:In Huadian Baiyinhua Jinshan Power Company Limited, #1, #2 turbines′ high and low pressure heaters′ terminal temperature differences are sharply higher than the designed value, with a maximum deviation of 13.94℃. After analyzing parameters collected from 300 ,400 and 565MW, causes are concluded that both the heaters′ water level and the extraction steam temperature exceeded standard values; and measures are put forward.
    Feasibility of application of heat pump technology in Fularji Thermal Power Plant
    WANG Xiaohong
    2015, 37(4):  39-40. 
    Asbtract ( 323 )  
    Related Articles | Metrics
    Abstract:The general situation of the heat pump unit of the Kiamusze Thermal Power Plant was introduced. The influence of the heat pump technology on the operation of the Kiamusze Thermal Power Plant was expounded. The feasibility to apply the heat pump technology in Fularji Thermal Power Plant was analysis. The differences between the heat pump technology parameters and the actual situation of the Fularji Thermal Power Plant were explained. The improvement measures were proposed.
    Analysis on fault of exciter rectifier of turbo generator and maintenance measures
    CHU Dong
    2015, 37(4):  41-42. 
    Asbtract ( 284 )  
    Related Articles | Metrics
    Abstract:The grounding shortcircuit fault of the brushless exciter occurred due to coke powder pollution. Based on analysis of device structure, the parameters needing monitoring and adjusting during operation, such as temperature and insulation parameters, were proposed. Some measures, such as insulation maintenance and periodic dust removal, were adopted, and the brushless exciter operates normally. 
    Analysis on vibration of bearing bush No.7 of 1000MW generator set in a power plant
    JI Yunsong
    2015, 37(4):  43-44. 
    Asbtract ( 302 )  
    Related Articles | Metrics
    Abstract:Taking the 1000MW generator set of a power plant as example, the monitoring data of vibration of each bearing during commissioning period were analyzed, and it was found that the vibration of the bearing bush No.7 exceeds standardpermitted value. According to investigations of startup process repeatedly, the reason of the vibration was found. The targeted measures were adopted, and the problem of vibration of bearing bush No.7 was solved.
    Reformation of bypass system of thermal power plant and optimization of protection control
    ZHUANG Xiangyang, ZHANG Qingfeng, ZHU Yong, WANG Youquan
    2015, 37(4):  45-47. 
    Asbtract ( 372 )  
    Related Articles | Metrics
    Abstract:After the bypass system of the 300MW condensing generator set of Hubei Huadian Xiangyang Power Generation Company Limited was reformed, it is needed to modify and perfect correlative logic. The hidden danger, which may occurs after the bypass system was rformed, was analyzed, and relevant control logic optimization measures were proposed. The unit bypass system had been reformed for a year, the system was tested by different conditions and operated reliably and stably.
    Application of intelligent control system of heat supply network in centralized heat supply projects
    CAO Peiqing
    2015, 37(4):  48-51. 
    Asbtract ( 323 )  
    Related Articles | Metrics
    Abstract:Aiming at the current situation of domestic heat supply management, a concept of intelligent heat supply management system was proposed. The structured design and realization method of the heat supply network intelligent management system of Huadian Energy Company Limited were introduced. The result in this paper provides a systematic management platform for safe, valable, intelligent and harmonious heat supply.
    Analysis on application of feedwater oxygenation treatment for unit No.7 of Zouxian Power Plant
    CUI Shaobo, SUN Wei, MA Wei
    2015, 37(4):  52-54. 
    Asbtract ( 386 )  
    Related Articles | Metrics
    Abstract:Taking the unit No.7 of Zhouxian Power Plant as example, the situation of feedwater treatment by all volatile treatment technology and oxygenation treatment technology was traced. Based on comparison of the water steam quality, the deposition on the water wall and the pressure losses of feedwater system, it was shown that the oxygenation treatment is more safe and economical operation mode for ultra supercritical oncethrough boiler unit.
    Analysis on fault of rotor conducting bolt of 390H generator
    GU Qing, YU Huafeng
    2015, 37(4):  55-57. 
    Asbtract ( 374 )  
    Related Articles | Metrics
    Abstract:After the 390H generators were put into operation at home, the fault probability of rotator conducting bolt was higher. Combining field evaluation and overhaul, the structure features of the collecting ring conducting bolt and the main lead conducting bolt of 390H generator were introduced. The fault reasons were analyzed, and some concrete maintenance suggestions were proposed.
    Solution of high fault rate of movable blade adjusting mechanism of axial flow fan
    RAO Hongjian
    2015, 37(4):  58-58. 
    Asbtract ( 372 )  
    Related Articles | Metrics
    Abstract:Taking the two 660MW coalfired units of Huadian Xinxiang Power Generation Company Limited as example, the reasons of higher fault rate of the movable blade adjusting mechanism of the forced draft fan and the primary air fan were analyzed. The concrete retrofit scheme was proposed and implemented, and favorable effect was obtained. 
    Analysis and improvement of primary frequency adjustment system in power plant
    ZHANG Wei, MA Liang, DU Wei
    2015, 37(4):  59-61. 
    Asbtract ( 401 )  
    Related Articles | Metrics
    Abstract:Under the background that Henan provincial electric power scheduling center carries on examinations of primary frequency adjustment of unified scheduling generators, given the current low quality primary frequency adjustment rate for Huadian Luohe Power Company′s firststage 2×330MW generator, we conduct a indepth analysis of frequency adjustment system, and improve it from the aspects of hardware, software, control logics. Finally, we achieved a substantial increase in quality rate.
    Analysis on reasons of slagging of 600MW front and backwalls opposed firing boiler and treatment
    CHEN Fei
    2015, 37(4):  62-63. 
    Asbtract ( 463 )  
    Related Articles | Metrics
    Abstract:In the two front and backwalls opposed firing boilers of a power pant, serious slagging problem was occurred after unplanned overhaul. Aiming at this problem, the reasons of slagging were analyzed. Some measures, such as to cntrol the quality of as fired coal and to adjust the operation parameters and combustion mode, were adopted, and the slsgging phenmenon was obviously improved.
    Study on numerical simulation of flow field uniformity in reactor of SCR system of thermal power plant
    CAO Wei
    2015, 37(4):  64-66. 
    Asbtract ( 289 )  
    Related Articles | Metrics
    Abstract:Taking the reactor of SCR system of the unit in a thermal power plant as study object, using the Computational fluid dynamics (CFD) software, numerical simulation analyis of the flue gas flow field of the reactor was carrid out. The guiding device of the system was designed by oneself. The flue gas contents and vilocity field, the ammonia mass fraction distribution and the flue gas pressure drop of the system under the boiler maximum continuos rating condition were analyzed. The features of the structural arrangement of the reactor was evaluated. The research results can be used as reference for design and improvement of the guiding dvice and the ammonia injection grid of the SCR reactor.
    Application of fluidized ash material level detector in pneumatic ash conveying system of electrostatic precipitator
    GAO Baohua, LI Zhi
    2015, 37(4):  67-71. 
    Asbtract ( 301 )  
    Related Articles | Metrics
    Abstract:The application of fluidized ash material level detector in dense phase positive pressure ash conveying system of electrostatic precipitator was introduced. The working process of the electrostatic precipitator and the relation between variation of material level of ash hopper and the working condition of the precipitator were expounded. The importance to detect the material level of the ash hopper and the ash fluidization status were described. The fluidized ash material level detector was recommended for supervision of the ash hopper material level of electrostatic precipitator and the fluidization status. By the measure, the automatic control of ash hopper material level was realized, and the operation reliability and the ash conveying efficiency of the electrostatic precipitator were improved. At the same time, the supervision results provide theoretical foundation for operation analysis of air and gas system and coal pulverizing system of the boiler and the environmental emission reducing.
    Study on grid simulator for testing high power photovoltaic inverter system
    SUN Gongwei1, ZENG Zehu1, ZHANG Chunwang2, YU Zhifei3
    2015, 37(4):  72-75. 
    Asbtract ( 351 )  
    Related Articles | Metrics
    Abstract:In order to test low voltage ridethrough(LVRT) function of high power photovoltaic converter, designing work of high power grid simulator is in need. Based on TI Company′s floatingpoint DSC processor—TMS320F28335, researchers structured a dual threephase bridge inverter system, i.e. integrating controllable rectifier and converter system into of dual threephase bridge system, for the purpose of creating grid simulator. Sampling voltage and set voltage were performed on double dq decomposition, thus segregating positive and negative sequence voltage, to realize asymmetric voltage drop. Meanwhile, a 100Hz notch filter was adopted in the decomposition process.Connected with photovoltaic converter, a power loop was formed; the system completed LVRT performance test successfully with only a little power consumption.