华电技术 ›› 2009, Vol. 31 ›› Issue (12): 51-53.

• 技术交流 • 上一篇    下一篇

拆除2万m3油罐的施工方案

李颖   

  1. 湖南省火电建设公司,湖南株洲 412000
  • 收稿日期:1900-01-01 修回日期:1900-01-01 出版日期:2009-12-25 发布日期:2009-12-25

Analysis of a working scheme for dismantling an oil tank with 20000m3 capacity

LI Ying   

  1. Hunan Thermal Power Construction Company, Zhuzhou 412000, China
  • Received:1900-01-01 Revised:1900-01-01 Online:2009-12-25 Published:2009-12-25

摘要: 介绍了某工程采用 “倒装法”拆除2万m3油罐的施工方案,对“倒装法”方案中临时加固措施材料选型及强度校核的计算进行了总结,以期能为同类项目施工提供参考。

关键词: 油罐, 拆除, 倒装法, 计算

Abstract: A working scheme of a project for dismantling of an oil tank with 20000m3 capacity was introduced, in which the ’reversal installation method’ had been adopted. The material selection and strength checking calculation for provisional reinforcement measures in the scheme were summarized. It is expected that the result could be used as reference in similar project.

Key words: oil tank, dismantle, reversal installation method, calculation