华电技术 ›› 2010, Vol. 32 ›› Issue (6): 72-75.

• 节能与环保 • 上一篇    下一篇

西塞山电厂烟气脱硫技术改造工程石膏脱水系统分析

邓辉鹏,沈煜晖   

  1. 中国华电工程(集团)有限公司,北京100035
  • 收稿日期:1900-01-01 修回日期:1900-01-01 出版日期:2010-06-25 发布日期:2010-06-25

Analysis for the gypsum dewatering system of flue gas desulphurization technical reformation project in Xisaishan Power Plant

DENG Huipeng, SHEN Yuhui   

  1. China Huadian Engineering Corporation Limited, Beijing 100035, China
  • Received:1900-01-01 Revised:1900-01-01 Online:2010-06-25 Published:2010-06-25

摘要: 介绍了湖北西塞山发电有限公司烟气脱硫技改工程石膏脱水系统的配置,分析了其工艺流程、出力匹配和运行检修。探讨了不同运行负荷下,西塞山电厂石膏脱水方案的优点,突出了石膏脱水系统流程清晰、工作可靠、运行灵活和节水、节能的特点。

关键词: 湿法烟气脱硫, 石膏脱水, 节能减排, 脱硫工艺, 优化, 石膏浆液缓冲箱

Abstract: The configuration of the gypsum dewatering system of the wet flue gas desulphurization technical reformation project in the Xisaishan Power Plant was introduced in detail. The process flow, the burden apportionment, the operation and the maintenance of the system were analyzed. The advantages of the gypsum dewatering scheme of the Xisaishan Power Plant in different load conditions were discussed; especially, the features of the gypsum dewatering system, such as the clear process flow, the high reliability, the operation flexibility, the watersaving and the energy saving ability were expounded emphatically.


Key words: wet flue gas desulphurization (WFGD), gypsum dewatering, energy-saving and emission-reducing, desulphurization process, optimization, gypsum slurry buffer tank