华电技术 ›› 2011, Vol. 33 ›› Issue (10): 60-63.

• 技术交流 • 上一篇    下一篇

600MW机组“防非停”热工系统优化改造

贺扬   

  1. 江苏国信扬州发电有限责任公司,江苏扬州225131
  • 收稿日期:1900-01-01 修回日期:1900-01-01 出版日期:2011-10-25 发布日期:2011-10-25

Optimized reformation of thermal system of 600MW unit for preventing unplanned outage

HE Yang   

  1. Jiangsu Guoxin Yangzhou Power Generation Company Limited, Yangzhou 225131, China
  • Received:1900-01-01 Revised:1900-01-01 Online:2011-10-25 Published:2011-10-25

摘要: 通过对江苏国信扬州发电有限责任公司热工系统中各个环节进行隐患排查,对相关控制系统、逻辑、现场元件进行优化整改,完善了热工系统,降低了机组非计划停运的可能性,保证了机组安全、稳定运行。

关键词: 非计划停运, 热工系统, 隐患, 控制, 优化, 整改

Abstract: The hidden dangers existed in each link of thermal system of Jiangsu Guoxin Yangzhou Power Generation Company Limited were investigated. The related control systems, logic and site components were rectified and optimized. The thermal system was perfected. Thus, the possibility of the unplanned outage was decreased; and the safe and stable operation of the unit was ensured.

Key words: unplanned outage, thermal system, hidden danger, control, optimization, rectification