超临界机组仿真机的调试和验收

刘江华   

  1. 广东大唐国际潮州发电有限责任公司,广东潮州515723
  • 收稿日期:1900-01-01 修回日期:1900-01-01 出版日期:2011-03-25 发布日期:2011-03-25

Commissioning and acceptance of supercritical power unit simulator

LIU Jianghua   

  1. Guangdong Datang International Chaozhou Power Generation Corporation Limited, Chaozhou 515723, China
  • Received:1900-01-01 Revised:1900-01-01 Online:2011-03-25 Published:2011-03-25

摘要: 针对目前电厂仿真机使用中存在的问题,以广东大唐国际潮州发电有限责任公司国产600MW超临界机组仿真机调试与验收为例,从仿真机就地部分及分散控制系统入手,从电厂角度出发,论述了仿真机模型的调试与验收,指出了重点调试过程及故障的调试和仿真机验收步骤及要点。利用仿真机在机组投产前、后对运行人员进行培训,对于提高全能值班能力和技术水平具有实际意义。

关键词: 超临界机组, 仿真机, 模型, 调试, 验收

Abstract: Contrapose the existing problems in simulator application, taking the commissioning and acceptance of domestic 600MW supercritical power unit simulator of Guangdong Datang International Chaozhou Power Corporation Limited as a example, from the local part of the simulator and distributed control system, also in the point of view of power plant, the simulator commissioning and check and acceptance were discussed, the main commissioning process, debugging about faults, check and acceptance procedures, and key points for the simulator were indicated. Training the operation personnel by use of the simulator before and after unit operation will have realistic meaning for rising allround operating ability and technical level.

Key words: supercritical unit, simulator, model, commissioning, check and accept