华电技术 ›› 2011, Vol. 33 ›› Issue (8): 62-66.

• 技术交流 • 上一篇    下一篇

200MW机组锅炉灭火保护系统优化

董茂良   

  1. 华电能源股份有限公司哈尔滨第三发电厂,黑龙江哈尔滨150024
  • 收稿日期:1900-01-01 修回日期:1900-01-01 出版日期:2011-08-25 发布日期:2011-08-25

Optimization of furnace safeguard supervision system of 200MW unit

DONG Maoliang   

  1. Huadian Energy Harbin Third Power Plant, Harbin 150024, China
  • Received:1900-01-01 Revised:1900-01-01 Online:2011-08-25 Published:2011-08-25

摘要: 介绍了华电能源哈尔滨第三发电厂200MW机组锅炉灭火保护系统优化前存在的问题,通过对系统的分析和实践,总结出优化后的解决方案并进行了实施,进一步提高了机组运行的可靠性。

关键词: 200MW机组, 灭火保护系统, 优化, 可编程控制系统

Abstract: The problems existing in original FSSS of the 200MW unit boiler of Huadian Energy Harbin Third Power Plant were introduced. According to analysis of the system and practice, the optimized solution was summarized and implemented; the operation reliability of the unit was enhanced further.
