摘要: 针对燃气轮机调峰运行的方式,详细分析了早开夜停、频繁启动对燃气轮机机组检修周期、设备安全经济运行、机组效率以及环境保护造成的影响。最后指出,选择燃气轮机机组的运行方式时,应尽量避免调峰运行和频繁启停。

关键词: 燃机, 调峰运行, 频繁启动, 可靠性, 安全性, 效率, 环保

Abstract: The peak-shaving gas turbine usually starts up at morning and shuts down at evening, the influence of this operation mode on the unit maintenance interval, the equipment safety and economic operation, the unit efficiency and the environment protection was analyzed in detail. And it is put forward finally that the peak-shaving operation and frequent starting and shutting would be avoided in the selection of gas turbine set operation mode if possible.