Huadian Technology ›› 2008, Vol. 30 ›› Issue (8): 16-19.
• 专题综述 • Previous Articles Next Articles
LUO Gui-ying,JIN Jian-rong ,QIU Han,YU Li-fan
Received:
Revised:
Published:
Abstract: The abnormal problems occurred frequently in starting and shutting process of S109FA tandem combined cycle unit manufactured by CE Corporation. These problems were as follow: the vacuity dropped when by-pass put in operation during cold starting, the control valve of high pressure by-pass closed no tightly and leaked when high by-pass quitted, the drain pressure of desuperheator can not achieved auto-close set point in operation with low load, the level in the drain tank of steam turbine proper lowered and vacuity dropped, the circulating water temperature deviation on the second outlet of condenser increased. The relevant handling methods for solving the problems mentioned above were put forward.
Key words: gas turbine, combined cycle, starting and shutting process, abnormality handling
LUO Gui-ying;JIN Jian-rong;QIU Han;YU Li-fan. Analysis of Abnormal Problem in Starting and shutting of S109FA Tandem Combined Cycle Unit[J]. Huadian Technology, 2008, 30(8): 16-19.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.hdpower.net/EN/
https://www.hdpower.net/EN/Y2008/V30/I8/16
Optimization strategy of multiple output cables samephase parallel operation for gas turbine generators
Evaluation of prefilter improvement effect of gas turbine air intake filtration system
Research on gas turbine combustion pressure fluctuation and the key technologies for its measurement
Analysis of temperature field and thermal stress of hightemperature steam pipe elbow in startup stage
Heatsupply modification for 9F gassteam combined cycle units
Comparison of DLN1.0+ and LEC-NextGen combustion system
Research on update interval optimization model of gas turbine inlet filtration system