Huadian Technology ›› 2011, Vol. 33 ›› Issue (3): 41-44.

• 技术交流 • Previous Articles     Next Articles

Analysis on problems of 300MW unit occurred during early period of production and optimized operation

CHEN Lizhi   

  1. Huadian Harbin Thermal Power Corporation Limited, Harbin 150064, China
  • Received:1900-01-01 Revised:1900-01-01 Online:2011-03-25 Published:2011-03-25

Abstract: The problems of two 300MW thermal power generating and heat providing units of Huadian Harbin Thermal Power Corporation Limited occurred in commission and operation during early period of production were analyzed. Some devices of the units were reformed rationally, and the operation mode was improved reasonably, so the security and the economical efficiency of the units were raised. 

Key words: completion of starting-up and adjustment operation, equipment reformation, operation mode, security, economic efficiency