Loading...
RSS
Toggle navigation
Home
About Journal
Editorial Board
Editorial Board
Publication Ethics
Journal Online
Just Accepted
Current Issue
Archive
Most Read Articles
Most Downloaded Articles
Most Cited Articles
Subscription
Advertisement
Contact Us
中文
Table of Content
25 March 2011, Volume 33 Issue 3
Previous Issue
Next Issue
专题综述
研究与开发
技术交流
节能与环保
新能源
专题综述
Forming reasons of oxide skin in supercritical/ultrasupercritical unit and preventive measures
FAN Wenbiao
2011, 33(3): 1-4.
Asbtract
(
1997
)
Related Articles
|
Metrics
The forming mechanism of the oxide skin in supercritical/ultrasupercritical unit and the main conditions of the oxide skin dropping in the inner wall of the superheater and the reheater were introduced. The main harms of the oxide skin were expounded. The relations between the oxide forming and the unit operation mode, the system configuration and the material selection were analyzed. The measures for preventing the oxide skin in periods of design, commissioning and operation were put forward.
Technical characteristics of acoustic pyrometry and its application in 1000MW ultrasupercritical boiler
CHEN Qin;YANG Quan;SHU Maolong
2011, 33(3): 5-7.
Asbtract
(
1482
)
Related Articles
|
Metrics
The furnace temperature is a key parameter for control of combustion process. The basic theory and characteristics of the acoustic pyrometry system were introduced, and its first application in domestic 1000MW ultrasupercritical boiler and common problems were analyzed. The results can be used as reference for application of this technology in other ultrasupercritical units.
Research for cold aerodynamic field of supercritical oncethrough boiler
WANG Chaoyang;CUI Yukui;
2011, 33(3): 8-10.
Asbtract
(
1509
)
Related Articles
|
Metrics
Contrapose the temperature deviations widely existing in horizontal flue of tangentially fired furnaces, the cold state aerodynamic test has been conducted in the newlybuilt boiler of Hebei Guohua Dingzhou Power Engineering Corporation Limited, the research focused on the flue gas distribution of the furnace outlet. The experiment has shown that through adjusting the angle of separated overfired air (SOFA) nozzle, the flue gas distribution of the furnace outlet can be improved effectively, guarantee homogeneous speed between right and left flue gas, and meet the demand of normal operation.
Commissioning and acceptance of supercritical power unit simulator
LIU Jianghua
2011, 33(3): 11-13.
Asbtract
(
1397
)
Related Articles
|
Metrics
Contrapose the existing problems in simulator application, taking the commissioning and acceptance of domestic 600MW supercritical power unit simulator of Guangdong Datang International Chaozhou Power Corporation Limited as a example, from the local part of the simulator and distributed control system, also in the point of view of power plant, the simulator commissioning and check and acceptance were discussed, the main commissioning process, debugging about faults, check and acceptance procedures, and key points for the simulator were indicated. Training the operation personnel by use of the simulator before and after unit operation will have realistic meaning for rising allround operating ability and technical level.
Application of power plant information realtime database system in 1000MW unit
WU Xiangtao;LIU Jianrong;HE Hui;ZHEN Wei
2011, 33(3): 14-15.
Asbtract
(
1229
)
Related Articles
|
Metrics
The power plant information (PI) realtime database system is necessary for the management layer of the power enterprise to analyze and optimize the production data for enhancing the enterprise competitive capacity. Combining with the application of the PI realtime database system in Zouxian Power Plant, the related problems of the system in installation and debugging were expounded.
研究与开发
Modeling and aerodynamic characteristics calculation of circulating water cooling tower in 300MW thermal power plant
PAN Wenrui;REN Jianxing;WENG Jianhua;ZENG Xianping
2011, 33(3): 16-19.
Asbtract
(
1340
)
Related Articles
|
Metrics
The circulating water temperature is an important index for ensuring good vacuum of condenser and reducing the energy consumption of unit. If the circulating water temperature decreased by 1℃, the vacuum of the condenser would increase by 400~500Pa, and the unit coal consumption would decrease by 1.0~1.5g/(kW·h). As an important equipment of circulating cooling system in thermal power plant, the cooling effect of cooling tower is the key factor influencing on circulating water temperature. Based on the consideration of enhancing the cooling effect of cooling tower, taking the hyperbolic wet cooling tower with natural convection in 300MW thermal power plant as prototype, a simulating test device for circulating cooling system was designed and built. The calculation of aerodynamic characteristics for the model tower was carried out to realize the purpose of simulating the internal flow of the cooling tower and evaluating the cooling effect in 300MW thermal power plant to some extent.
The method of shafts alignment of a turbogenerator set
HUANG Guoqiang
2011, 33(3): 20-23.
Asbtract
(
1473
)
Related Articles
|
Metrics
Shafts alignment is the most important procedure in a turbogenerator set installation, which is related with the safety, stability and operation economy of units. The right method and procedure for aligning the shafts of turbogenerator set are the key guarantee to successfully install. This paper introduced the correlation method and procedure for shafts alignment, and the relating matters needed to pay attention were pointed out.
Reasons analysis on of T92 steel pipe bursting of high temperature superheater
DONG Hongnian
2011, 33(3): 24-28.
Asbtract
(
1443
)
Related Articles
|
Metrics
The T92 steel outlet pipe of high temperature superheater of a power plant bursted. The normal temperature tensile test and the high temperature tensile test for the cracked pipe and six pipes around the cracked pipe were carried out respectively. Combining with the practical site situation and through comparison and analysis of test results, the real reasons of this pipe crack accident were investigated, and relevant measures were proposed for preventing the pipe crack occurring once again.
Inspection of pipe bends of power plant boiler using ultrasonic phased array technology
YU Daoguo
2011, 33(3): 29-30.
Asbtract
(
1180
)
Related Articles
|
Metrics
In the periodical inspection of the connecting pipe bend from economizer to steam drum, it was found that the reflection signal exceeds the specified value. Using A scan pulse echo technology, the flaw echo could be found, but the exact defect information could not be judged. Using the TOFD technique to recheck, the defect could not be detected. When using the ultrasonic wave phased array method, the defect was detected easily. Based on the detection results of ultrasonic wave phased array method, the exact defect information could be obtained.
Analysis on faults of FZ1-2A rotary tipper system and its treatment
YANG Zhangang;BI Yunying;ZHANG Chao
2011, 33(3): 31-34.
Asbtract
(
1390
)
Related Articles
|
Metrics
The operation flow process and general circumstance of the two wagon tippers of Tianjin Chentang Thermoelectric Corporation Limited. were introduced. The main problems occurred in operation were analyzed, and the reformation scheme was put forward. Presently the reformed wagon tipper system is in good operation condition, and ensures the system running has safely and stability.
Barcode identification technology of concrete mixingbuilding installation unit and its application
MA Bin
2011, 33(3): 35-37.
Asbtract
(
1482
)
Related Articles
|
Metrics
Combining with the characteristics of barcode identification technology,the research put emphasis on the method to use this technology instead of the old numbering mode in the concrete mixing building installation and pull down, a set of suitable process flow for enterprise to use was designed, a specific operation rule was formulated.
Automatic generation control strategy based on control performance standard
ZHANG Zhixiong;YANG Ping
2011, 33(3): 38-40.
Asbtract
(
1730
)
Related Articles
|
Metrics
Under the control performance standard (CPS), automatic electric power generation control strategies mainly include two schemes: one is adjustment mode of original scheme, another is newdesigned mode based on new standards. The adjustment mode is useful for the transition from old standard to new standard, the newdesigned mode places extra emphasis on implementation of CPS. Each of them has own specialty and relevant scope of application; and the development prospects of the two strategies are also different.
技术交流
Analysis on problems of 300MW unit occurred during early period of production and optimized operation
CHEN Lizhi
2011, 33(3): 41-44.
Asbtract
(
1595
)
Related Articles
|
Metrics
The problems of two 300MW thermal power generating and heat providing units of Huadian Harbin Thermal Power Corporation Limited occurred in commission and operation during early period of production were analyzed. Some devices of the units were reformed rationally, and the operation mode was improved reasonably, so the security and the economical efficiency of the units were raised.
Technical reformation of dualbackpressure condenser vacuumpumping system
ZENG Hua
2011, 33(3): 45-47.
Asbtract
(
1206
)
Related Articles
|
Metrics
Using the dualbackpressure condenser vacuumpumping system, the average vacuity of the dualbackpressure condenser can achieve designed value, and the consumption of auxiliary power can be reduced in large amplitude. If the singlemain piping vacuumpumping system of 600MW unit is transformed into dualmail piping doublesuction vacuumpumping system, its average vacuity can increase 0.7245kPa, and the coal consumption can be reduced by 4284.755t each year. If the dualmain piping singlesuction vacuumpumping system of 600MW unit is transformed into dualmail piping doublesuction vacuumpumping system, one vacuum pump can reduce the auxiliary power consumption by 621997kW·h each year. The economic benefits and the social effects of the technical reformation of the dualpressure condenser vacuum pumping system are notable.
研究与开发
Selection of bypass mode for the motor frequency converter of thermal power plants
ZHANG Xiaobing
2011, 33(3): 48-49.
Asbtract
(
1510
)
Related Articles
|
Metrics
The movement process of different bypass switchover modes for auxiliary motor frequency converter of thermal power plant were introduced, it was analyzed that the influences on operating conditions of pump motor frequency converter and fan motor frequency converter by automatic and manual bypass switchover modes, which can be for a reference when other power plants transform motor frequency control.
技术交流
Reformation of condenser of 300MW unit
WU Baohua;LIU Hui;LIU Bin
2011, 33(3): 50-51.
Asbtract
(
1443
)
Related Articles
|
Metrics
Combining with practical reformation of a power plant, the leakage reasons of the condenser copper pipe were analyzed. The feasibility of selecting the stainless steel pipe as cooling pipe of condenser was discussed, which provides certain reference for condenser reformation of thermal power units.
Treatment of the frequent action fault of the emergency steam trap valve in low pressure heater
LI Xingmin
2011, 33(3): 52-54.
Asbtract
(
1175
)
Related Articles
|
Metrics
The emergency steam trap valve of low pressure(LP) heater number 8B of unit number 5 in Huadian International Zouxian Power Plant was frequently acted under condition of high load, and this bring unfavorable influence on safety and economical operation of the unit. The reason of the fault was investigated. It is found by the investigation that the spring of regulating valve, which is installed in the normal drain pipe from LP heater number 6 to LP heater number 7A, was broken, and this caused the quantity of drain water in B side of LP heater system is larger than that in A side, and further caused the emergency steam trap valve of LP heater number 8B to act frequently. After the spring and the sealing ring were replaced, the emergency steam trap valve no longer acts frequently.
Treatment of leakage in middle surface flange of high pressure heater
DUAN Jipeng
2011, 33(3): 55-56.
Asbtract
(
1321
)
Related Articles
|
Metrics
The reasons of leakage in middle surface flange of the high pressure heater in Xinjiang Baicheng Power Plant were analyzed. The method and concrete requirements for treating the groove in joint face of the middle surface flange were given in detail. The leakage in the middle surface flange was solved effectively.
Method for improving effects of equipment overhaul in power plants
LI Aimin
2011, 33(3): 57-59.
Asbtract
(
1418
)
Related Articles
|
Metrics
Aiming at the dissatisfactory overhaul effects of power plant at present, the problems in some aspects, such as the personnel quality, the construction scheme, the construction organization, the configuration of machines and tools, the overhaul management mechanism and the equipment research groundwork, were analyzed. The relevant countermeasures were put forward, which may provide reference for power plants to improve their equipments overhaul.
Measurement and adjustment for total axial drifting value and working clearance of CHTC5/5SP2 feed pump
HUANG Xianhua
2011, 33(3): 60-61.
Asbtract
(
1770
)
Related Articles
|
Metrics
The measurement and adjustment of total axial drifting value and working clearance of feed pump are the important links in feed pump overhaul; and its basic purpose is to make the feed pump impeller to be always in accordance with the center position of the guide vane slot and avoid the friction between the rotating part and the static part of the pump; which will be helpful to enhancing the pump efficiency. According to the equilibrium principle of feed pump, starting from the measurement and adjustment of the axial thrust, combining with the practical working experience, the problems on enhancing the feed pump overhaul quality were expounded.
Application of virtual instrument in power plant
YU Lifan
2011, 33(3): 62-63.
Asbtract
(
1988
)
Related Articles
|
Metrics
The definition and the characteristics of the virtual instrument were introduced, and the reason of probation of the virtual instruments in power plant was explained. When the virtual USB oscilloscope is used directly, some difficulties exist in reading and analysis; and the probation example of the oscilloscope after improvement and the matters needing attention were given.
Integrally replacing method of heat pipe type air preheater
HOU Zhicheng
2011, 33(3): 64-66.
Asbtract
(
1499
)
Related Articles
|
Metrics
Some problems, such as the serious wear, the decreased heat exchange efficiency and the increased air leakage, existed in heat pipe type air preheater of boiler No.7 of Tianjin Junliangcheng Power Generation Corporation Limited. The construction technical scheme for integrally replacing the heat pipe type air preheater and relevant safety precautions were introduced in detail. The comparison of the test data after replacing with that before replacing indicates that after the heat pipe type air preheater had been replaced, the operation situation was obviously improved, and the prospective effect was achieved.
Main points of Quality control for thermal power plant construction
GUO Zhijian;WEN Zhihua
2011, 33(3): 67-68.
Asbtract
(
1601
)
Related Articles
|
Metrics
The power plant construction quality directly affects the safety, stability and operation economy of units,energy conservation, environment protection and the service life after the unit putting into operation. Aiming at the construction characteristics of thermal power projects, the key points for construction quality control about the civil engineering, boiler, steam turbine, electric, thermal control system and weld, etc. were expounded and summarized, expecting to give same reference for thermal power plant construction.
节能与环保
NO
x
emission control technology in boiler and its application
CAO Dinghua;LIU Haiyang
2011, 33(3): 69-72.
Asbtract
(
1152
)
Related Articles
|
Metrics
The control for the pollutants emission from power plant by the government is becoming more and more stringent. Under the premises of boiler combustion stability and the high combustion efficiency, it is very important to control the NO
x
emission. The generative mechanisms of the NO
x
were introduced. The influences of the burners with different structure on the NO
x
analyzed. The application of the NO
x
restraining technology in Inner Mongolia Huadian Baotou Power Generation Corporation Limited was expounded.
The improvement for the limestone slurry agitator base in desulfurization system of 600MW supercritical unit
YIN Pengfei
2011, 33(3): 73-74.
Asbtract
(
1397
)
Related Articles
|
Metrics
The rocking problem of whole limestone slurry agitator of the unit No.3 and No.4 desulfurization system in Guangdong Zhuhai Jinwan Power Generation Corporation Limited was analyzed, and the cause of rocking was found out, after implementing the pertinence measures, the rocking problem of the whole agitator was solved radically, hoping this experience can be a reference to solve the same problems.
新能源
Design of electric monitoring system for photovoltaic power station based on PS6000+
ZHANG Qi
2011, 33(3): 75-78.
Asbtract
(
1534
)
Related Articles
|
Metrics
Taking the Qinghai Xitieshan 10MW photovoltaic power station connected into power grid as example, the design idea, the hierarchical structure and the networking configuration scheme of the electric monitoring system for photovoltaic power station were expounded. The features and existing problems of the system were described.
Author Center
Online Submission
Citation Format
Copyright Agreement
Template
Author Guidelines
Review Center
Peer Review
Editor Work
Editor-in-Chief
Office Work
Journal Online
Just Accepted
Current Issue
Archive
Most Read Articles
Most Downloaded Articles
Most Cited Articles