Huadian Technology ›› 2011, Vol. 33 ›› Issue (7): 45-47.
• 技术交流 • Previous Articles Next Articles
TANG Jiahong
Received:
Revised:
Online:
Published:
Abstract: There were serious electric discharge vestiges existing in high voltage side phase B bushing end shield of the 220kV transformer in a power plant. The acetylene exceeding the standard was inspected out in the insulating oil in the bushing. Based on analysis, it was judged that the fault reason is the defects of the bushing onhline detecting device in its design and installation, which cause the end shield grounding wire to be broken in operation, the end shield was in suspension, its electric potential was raised and the electric discharge was occurred. A new site bushing replacing method was put forward, in which the discharge of the transformer oil is not needed. By using this method, a mass of manpower and material resource was saved, and the repair time duration was shortened.
Key words: transformer, high voltage bushing, end shield, fault
TANG Jiahong. Analysis on reasons of high voltage bushing end shield fault of 220kV transformer and treatment[J]. Huadian Technology, 2011, 33(7): 45-47.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.hdpower.net/EN/
https://www.hdpower.net/EN/Y2011/V33/I7/45
一起电子互感器异常引发的复杂发展性故障分析及改进
Fault recovery strategy for distribution network with isolated island and reconfiguration
Fault analysis on desulfurization DCS signal interference in a thermal power plant