Huadian Technology ›› 2012, Vol. 34 ›› Issue (3): 41-44.
• 技术交流 • Previous Articles Next Articles
Hoisting method of heating surface for 660MW supercritical boiler in whole closed boiler room
Received:
Revised:
Published:
Abstract: The problems existing in winter construction of 660MW supercritical boiler were analyzed. Taking the heating surface hoisting scheme of the boiler No.1 in Jiutai Power Plant under the condition of whole closed boiler room as example, the boiler heating surface hoisting measures under the condition of whole closed boiler room were expounded.
Key words: 660MW unit, supercritical boiler, whole closed heating surface, hoisting measure, problem analysis
Hoisting method of heating surface for 0MW supercritical boiler in whole closed boiler room. Hoisting method of heating surface for 660MW supercritical boiler in whole closed boiler room[J]. Huadian Technology, 2012, 34(3): 41-44.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.hdpower.net/EN/
https://www.hdpower.net/EN/Y2012/V34/I3/41