Hoisting method of heating surface for 660MW supercritical boiler in whole closed boiler room

Hoisting method of heating surface for 660MW supercritical boiler in whole closed boiler room   

  1. Heilongjiang No.3 Thermal Power Construction Corporation, Harbin 150016, China
  • Received:1900-01-01 Revised:1900-01-01 Online:2012-03-25 Published:2012-03-25

Abstract: The problems existing in winter construction of 660MW supercritical boiler were analyzed. Taking the heating surface hoisting scheme of the boiler No.1 in Jiutai Power Plant under the condition of whole closed boiler room as example, the boiler heating surface hoisting measures under the condition of whole closed boiler room were expounded.

Key words: 660MW unit, supercritical boiler, whole closed heating surface, hoisting measure, problem analysis