Huadian Technology ›› 2013, Vol. 35 ›› Issue (10): 54-55.
Previous Articles Next Articles
Online:
Published:
Abstract: Abstract:In order to face extreme malignant accident of power plantwide power outage, very high accident handling ability and flexible problemsolving ability are needed for the operators. In order to prevent other accidents may caused by the accident of power plantwide power outage and to ensure the stopped units to restart orderly, according to the problems existing in Togtoh Power Generation Company Limited, the effective and feasible controlling strategy and solutions were put forward.
Key words: Key words:companywide power outage, black start, strategy, precontrol
LI Jiancheng. Response strategy to face power plantwide power outage[J]. Huadian Technology, 2013, 35(10): 54-55.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.hdpower.net/EN/
https://www.hdpower.net/EN/Y2013/V35/I10/54
Optimization strategy of multiple output cables samephase parallel operation for gas turbine generators
Analysis of FCB function in Yangmei Xishangzhuang 2×660MW thermal power units