Huadian Technology ›› 2013, Vol. 35 ›› Issue (4): 33-36.
• 技术交流 • Previous Articles Next Articles
YANG Feiping
Received:
Revised:
Published:
Abstract: The improper adjustment of feed water flow for supercritical oncethrough boiler became the important reason to lead unit outage. The feed water flow adjustment methods for oncethrough boiler under the wet state, the dry state and the transforming process of wet state to dry state were introduced in detail, and the matters needing attention in each period were presented, which can be used as reference for related personnel.
Key words: supercritical, once-through boiler, feed water flow, adjustment, dry state, wet state, transforming of wet state to dry state
YANG Feiping. Feed water flow control strategy for supercritical oncethrough boiler[J]. Huadian Technology, 2013, 35(4): 33-36.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.hdpower.net/EN/
https://www.hdpower.net/EN/Y2013/V35/I4/33
Retrofit and combustion adjustment of a lownitrogen burner in a 330MW cogeneration unit
Influence of 600MW supercritical unit steam distribution characteristics on shaft vibration
Analysis of FCB function in Yangmei Xishangzhuang 2×660MW thermal power units
Reasons analysis for tube blasting and preventive measures for superheater of 1000MW supercritical boiler
Cause analysis and preventive measures of abnormal regulation of AGC in a power plant