Huadian Technology ›› 2013, Vol. 35 ›› Issue (4): 47-49.
• 技术交流 • Previous Articles Next Articles
ZHANG Taishan, LU Shiwen, ZHU Wei
Received:
Revised:
Online:
Published:
Abstract: The defects in design and manufacturing of the heatsupplying extraction control valve of the gassteam combined cycle turbine were analyzed. The reasons causing the transition connector screw rod of the piston rod of the hydraulic servomotor to bend during startup were found. The defects treatment concrete measures were given, and the normal operation of the extraction control valve was ensured.
Key words: gas-steam combined cycle unit, gas turbine, steam extraction control valve, transition connector, defect
ZHANG Taishan;LU Shiwen;ZHU Wei. Treatment of defect of steam extraction control valve of 9E gassteam combined cycle turbine[J]. Huadian Technology, 2013, 35(4): 47-49.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.hdpower.net/EN/
https://www.hdpower.net/EN/Y2013/V35/I4/47
Optimization strategy of multiple output cables samephase parallel operation for gas turbine generators
Evaluation of prefilter improvement effect of gas turbine air intake filtration system
Research on gas turbine combustion pressure fluctuation and the key technologies for its measurement
Analysis of temperature field and thermal stress of hightemperature steam pipe elbow in startup stage
Comparison of DLN1.0+ and LEC-NextGen combustion system
Research on update interval optimization model of gas turbine inlet filtration system
Model selection and installation of coupling for the LM series aeroderivative gas turbine generator
Cause analysis and solution for ignition failure of V94.3A gas turbine
Cause analysis on the fillet weld cracking of the outlet header socket of hightemperature reheater