Application of gas turbine with 6B level of capacity in distributed energy station

ZENG Rongpeng1, ZENG Weiwei1, WU Dongzhan2   

  1. (1.Beijing Longwei Power Generation Technology Company Limited, Beijing 100044, China; 2.China Huadian Engineering Corporation Limited, Beijing 100044, China)
  • Received:1900-01-01 Revised:1900-01-01 Online:2013-05-25 Published:2013-05-25

Abstract: The features of the gas turbines with 6B and 9E level of capacity used in CCHP system were compared. The technical progress of the gas turbine with 6B level of capacity was introduced. Combining with concrete examples, considering several aspects, such as the performance of the gas turbine, the cogeneration of cooling heating and power, the utility rate of primary energy, the thermal efficiency, the return of investment and so on, the unit type selection for 6B level gas turbine energy station was analyzed. The influences of the fuel price, the electricity price and other factors on the investment payoff period were discussed.

Key words: natural gas, gas turbine, cogeneration of cooling heating and power (CCHP), case analysis