Huadian Technology ›› 2014, Vol. 36 ›› Issue (9): 21-23.

Previous Articles     Next Articles

Strengthening and correcting scheme of highvoltage power line tower in minedout area of fully mechanized topcoal caving face of coal mine

  

  1. (Inner Mongolia Mengtai Buliangoumeiye Company Limited, Huadian Coal Industry Group Corporation Limited, Junggar 010303, China)
  • Online:2014-09-25 Published:2014-11-19

Abstract: Abstract:The safe operation of the highvoltage power transmission line above minedout area of the coal mine fullymechanized topcoal caving face is threatened and damaged by the mining. The influence of the ground deformation of the minedout area on the power transmission steel tower was studied in detail. Based on this, referring to domestic and overseas treatment scheme of highvoltage power line tower strengthening in minedout area, a strengthening and correcting scheme of highvoltage power line tower on the minedout area of fully mechanized topcoal caving face was proposed. The scheme had been implemented, and better result was obtained.

Key words: Keywords:coal mine, fullymechanized topcoal caving face, minedout area, highvoltage power line tower, protection, strengthening