Huadian Technology ›› 2014, Vol. 36 ›› Issue (9): 8-10.
Previous Articles Next Articles
Published:
Abstract: Abstract:There are larger difficulties in installation of tower type boiler of 2×1000MW unit in Pengcheng Power Plant. Especially, the installation of the “three devices” inside the boiler is difficult point in the boiler installation due to condition restrictions. Starting from the angle of installation technology, a hoisting system was designed, and the technical difficulty in lifting of the “three devices” inside boiler was solved. Better economic benefit and social effect were obtained.
Key words: Keywords:towertype boiler, economizer, reheater, superheater, lifting scheme, hoisting system
WU Desheng. Design of special lifting scheme of “three devices” inside towertype boiler of 1000MW unit[J]. Huadian Technology, 2014, 36(9): 8-10.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.hdpower.net/EN/
https://www.hdpower.net/EN/Y2014/V36/I9/8
Optimization of air preheater leakage control system in 670MW unit
Cause analysis on the fillet weld cracking of the outlet header socket of hightemperature reheater
Cause analysis and solution for tube burst in highpressure superheater of NG-M701F-R heat recovery boiler
Reasons analysis for tube blasting and preventive measures for superheater of 1000MW supercritical boiler
Application of mobile sonic soot blowers in economizer of 660MW boiler