华电技术 ›› 2011, Vol. 33 ›› Issue (11): 49-51.

• 技术交流 • 上一篇    下一篇

凝结水处理混床出水试验分析

崔绍波   

  1. 华电国际邹县发电厂,山东邹城273522
  • 收稿日期:1900-01-01 修回日期:1900-01-01 出版日期:2011-11-25 发布日期:2011-11-25

Analysis on output water test of condensate treating mixed bed

CUI Shaobo   

  1. Huadian International Zouxian Power Plant, Zoucheng 273522, China
  • Received:1900-01-01 Revised:1900-01-01 Online:2011-11-25 Published:2011-11-25

摘要: 结合华电国际邹县发电厂8台发电机组凝结水水质情况,通过凝结水处理混床出水监督指标试验分析,使运行人员更加方便地找出了监测混床出水指标的失效控制参数,以避免混床因某项指标超标而失效运行,从而保证更加优良的水、汽品质。

关键词: 凝结水, 混床, 出水, 试验, 分析

Abstract: Combining with the condensate quality of eight generator units of Huadian International Zouxian Power Plant, according to the test and analysis on the monitoring indices of the output water of condensate treating mixed bed, the operator can find the failure controlled parameters in output water quality indices monitoring of mixed bed more conveniently; so the failure operation of the mixed bed with an outoflimited parameter was avoided, and more excellent water quality and steam quality were ensured.

Key words: condensed water, mixed bed, output water, test, analysis