Cleaning management of 660MW ultra supercritical unit in construction period

YI Darui1, WANG Xiaoya2   

  1. 1.Jiangsu Guohua Chenjiagang Power Generation Company Limited, Yancheng 224631, China; 2.Jiangsu Electric Power Construction Third Engineering Company, Zhenjiang 212003, China
  • Received:1900-01-01 Revised:1900-01-01 Online:2012-11-25 Published:2012-11-25

Abstract: The cleaning management of a thermal power plant in construction period is very important for the safe and stable operation of the boiler heating surface pipes. According to practical experiences, the control situations of all stages were analyzed. The concrete measures of the boiler cleaning inspection were given. The inspection measures were implemented, a large number of foreign bodies were cleaned out, and the good effect was obtained.

Key words: ultra supercritical unit, boiler, cleaning management, foreign body