Huadian Technology ›› 2012, Vol. 34 ›› Issue (S1): 11-12.
• 研究与开发 • Previous Articles Next Articles
HUA Yudong1, JIN Peijun1,XU Zhengrong2
Received:
Revised:
Online:
Published:
Abstract: According to the requirements of quick starting of the peak shaving power plant and the requirement of fire protection and explosion prevention for the gasfired unit, combining with the practical situation of the unit, some technical data, such as the practical space volume occupied by the gas turbine and the heat recovery boiler, the air flow for purging of the gas turbine at the purging rotate speed, the purging air replacement ratio and so on, were analyzed. The time needed for gas turbine purging was reconfirmed. According to the final calculation result, the gas turbine purging time was shortened from 15min to 10min. The starting time of the unit was shortened, and the startup speed of the peak shaving power plant was improved.
Key words: 9E gas turbine, boiler, purging time, purge ratio, purge flow
HUA Yudong;JIN Peijun;XU Zhengrong. Optimization of purging time of gas turbine[J]. Huadian Technology, 2012, 34(S1): 11-12.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.hdpower.net/EN/
https://www.hdpower.net/EN/Y2012/V34/IS1/11
Comparative analysis of calculation models for thermal efficiencies of waste heat boilers in gassteam combined cycle units
Comprehensive upgrading reconstruction and performance analysis of a subcritical boiler
Retrofit of lownitrogen burner in lean coal boiler with storagetype hot air pulverized coal feeding system