Abstract: Rational configuration of the auxiliary power system of a power plant is the basis for ensuring the safe and stable operation of the units. Aiming at the potential safety hazard existing in the public and water processing power distribution system of a power plant, the reformation scheme was proposed. The reliability of the reformed power supply system was improved greatly. The scheme can be used as reference for handling with similar problems.

Key words: auxiliary power system, high-voltage startup and stand-by auxiliary transformer, power distribution, double power supply, reformation scheme