Huadian Technology ›› 2014, Vol. 36 ›› Issue (4): 1-4.

    Next Articles

Some critical problems in integrated design of natural gas distributed energy station system

  

  1. (China Huadian Engineering Corporation Limited, Beijing 100070, China)
  • Online:2014-04-25 Published:2014-06-16

Abstract: Abstract:In order to improve the energy multipurpose utilization rate and the economic efficiency of the natural gas distributed energy station system, the problems in system integrated design process, such as the load statistics and analysis, the selection of main machine devices, the selection of peak shaving equipment, the electric power input and output transmission, the temperature of flue gas of the system and others, were analyzed and summarized. The result in this paper can be used as reference for integrated design of distributed energy station system.

Key words: Keywords:natural gas distributed energy station, load, selection of main machine, peak shaving equipment, electric power input and output transmission, temperature of flue gas