660MW unit blendedcombustion inferior coal adjusting analysis

  

  1. Anhui Huadian Lu’an Power Plant Company Limited, Lu’an 237126, China
  • Online:2017-04-25 Published:2017-05-23

Abstract:

Due to serious competition, more and more large capacity power plants prefer to blendedcombustion inferior coal for lower cost. During blendedcombustion, the operation safety, load and pressure shall be ensured to avoid coalwater unbalance. This paper discussed the assurance measurements, especially the operation safety while peak load and underload.